1·Mechanism of the abrasion on induced draft fan and powder exhaust fan is introduced briefly.
简要分析了引风机和排粉风机的磨损机理。
2·Abrasion and repair condition of axle neck of induced draft fan for boiler in power plant is introduced.
介绍了电厂锅炉引风机承力侧轴颈的磨损和修复情况。
3·If the unit needs to stop the incinerator, then after blowing, outage send, induced draft fan for stuffy furnace.
如机组需要停炉处理,则吹扫完成后,停运送、引风机进行闷炉。
4·New idea and new structure of air seal design for centrifugal induced draft fan is put forward through field inspection.
通过现场实地考察提出了排蒸汽离心引风机汽封设计的新思路、新结构。
5·According to principium of wear, wear reason of the induced draft fan (ID fan) and the factors that affect wear were analysed.
从磨损的机理入手,分析了电站引风机磨损的诸多因素。
6·Dust is drawn by induced draft fan form manual boiler and enters sealed water bath case. The dust collection efficiency is 81%.
手烧锅炉烟气被风机牵引,进入封闭的水浴箱处理,其除尘效率达81%。
7·Once the coal blocking coking plant boiler induced draft fan, the coal share appears disorders, severe Formation coal suspension.
焦化厂锅炉引风机一旦发生下煤阻塞,整个配煤份额就呈现失调,严峻时形成输煤中止。
8·Against existing problem of imported boiler induced draft fan in power station, the plan of reasonable reformation is put forward.
针对进口电站锅炉引风机所存在的问题,提出了合理改造的方案。
9·The anti-noise sponges inside the screen of the air filter and the muffler of the induced draft fan should be cleaned or changed regularly.
空气过滤器滤网、引风机消声器的消声海绵要定期清洗或更换。
10·The thesis analyses the possible reason causing the reliability state of Induced draft fan to change, it also analyses the treatment methods.
文章还分析了引起引风机可靠性状态变化的可能原因及其处理方法。
1·Combustion chamber, chimney, induced draft fan etc all installed in the workshop with external, to ensure the workshop of sanitary and worker safety.
燃烧室、烟囱、引风机等全部安装在车间外部,保证了车间内的卫生和工人的安全。
2·New idea and new structure of air seal design for centrifugal induced draft fan is put forward through field inspection.
通过现场实地考察提出了排蒸汽离心引风机汽封设计的新思路、新结构。
3·Against existing problem of imported boiler induced draft fan in power station, the plan of reasonable reformation is put forward.
针对进口电站锅炉引风机所存在的问题,提出了合理改造的方案。
4·If the unit needs to stop the incinerator, then after blowing, outage send, induced draft fan for stuffy furnace.
如机组需要停炉处理,则吹扫完成后,停运送、引风机进行闷炉。